Issue |
Sust. Build.
Volume 4, 2019
|
|
---|---|---|
Article Number | 2 | |
Number of page(s) | 6 | |
Section | Social and Economic Sustainability | |
DOI | https://doi.org/10.1051/sbuild/2019002 | |
Published online | 16 April 2019 |
Research Article
Are we ready for circular economy? Towards zero waste in construction
University of New South Wales, Sydney, Australia
* e-mail: rensiew10@gmail.com
Received:
16
February
2019
Accepted:
20
March
2019
Over the past decade, the concept of circular economy (CE) has emerged encouraging a rethinking of the way products are designed so that they can be “made to be made again”, turning the conveyor belt of consumerism into a circle (a closed-loop supply chain) and hence eliminate waste. The construction sector, especially, is known to be one of the main contributors of material waste-to-landfill. This paper investigates (i) the causes of construction waste and (ii) the readiness of the construction sector in Malaysia to embrace CE. Based on the relative importance index (RII), the five main causes of construction waste in Malaysia identified include frequent design changes (RII = 0.853) by owner or agent during construction followed by poor site management and supervision (RII = 0.835), changes in material specification and type (RII = 0.803), rework (RII = 0.719) and lack of coordination between parties (RII = 0.680). Survey findings also show that a majority (75%) of stakeholders within the Malaysian construction industry is unfamiliar with the concept of CE while 90% of the respondents claim that they are not ready to implement such practices within the next 5 years. It is anticipated that the findings from this paper will be of interest to construction practitioners.
Key words: sustainability / circular economy / sustainable construction / waste / Malaysia
© R. Siew, published by EDP Sciences, 2019
This is an Open Access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.